Update Week Ending June 01, 2012
Remedial Contractor Continues Site Remediation
|
On-going activities:
-
Initiated the excavation and installation of the barrier cement bentonite wall (CBW) along Willow Avenue. Applied odor suppressant foam to prevent odors from leaving the Site.
-
Continued the preparation and load-out of excavated CBW spoils from the temporary fabric structure (TFS) and transported the material in lined, covered trucks for proper disposal.
-
Applied water throughout the Site to prevent the formation of dust.
-
Continued maintenance of erosion and sediment controls throughout the Site.
-
Continued general housekeeping activities at the Site.
-
Continued monitoring for noise, vibration, and settlement on Site and on neighboring properties.
|
Recently completed activities:
-
Completed installation of temporary electrical service at 25 Willow Avenue.
-
Completed excavation and installation of the barrier cement bentonite wall (CBW) along Bay Street.
Future near-term activities:
-
Initiate the installation of well points for dewatering areas of the Site to be excavated.
-
Initiate demolition of the warehouse building.
Community Air Monitoring Plan Summary
Community air monitoring, initiated in February 2012, continues as intrusive activities are conducted by the remediation contractor at OU-2. There were no exceedances of action levels during this period.
Staten Island Community Board #1 One Edgewater Plaza Room 217 Staten Island, NY 10305 Phone #: (718) 981-6900 |
Borough President’s Office Borough Hall Staten Island, New York 10301 Phone #: (718) 816-2057 |
If you have any questions or comments about the work on the site, please use the OU-1/ OU-2 Site Telephone Hotline at 718-982-7349.